Beker Parking lot
Construction of parking lot including infrastructure and shackling throughout the parking lot, installation of parking system in the parking lot including engineering design
The parking lot contains about 100 parking spaces and is located in the ground opposite the Soho restaurant.
The complex works 24 hours 7 days a week.
There are 2 lanes in the parking lot: entrance and exit with traffic island and barriers
At the request of the client “turn key” project